31-Aug-2012
Energy management case study for global pharmaceutical manufacturer – Argentina
Design and Build | HVAC | Services | Consulting | Sustainability |
Facility: Effervescent sachets manufacturing area – low relative humidity required
Issue: Very high energy demand driven by original HVAC design and unable to meet product-critical conditions during summer months
Brief: Reduce energy demand without compromising on product quality or compliance
Solution:
- Reduce existing air change rates
- Reduce existing fresh air volume
- Install new VSDs to the supply air fans
- Replace the existing supply air diffusers to improve air distribution
- Recommission and balance the complete manufacturing areas HVAC system
- Supported upgrade of BMS system, installation of VSDs
- Maintenance upgrade of filtration and control valve replacement
- Completed product risk assessments, Engineering Change Control documentation and all required regulatory documentation covering the changes
Subscribe now to Cleanroom Technology to get unrestricted online access to our exclusive content and receive our high quality magazine every month.
| EECO2 Ltd | company profile | |
| website |
